News and Events 新闻和活动

Pre-heater System

Views: 0     Author: Site Editor     Publish Time: 2024-08-26      Origin: Site

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

LAFA' s brand new LFRF5 Five-Stage Cyclone Preheater system with calciner has adopted our double spraying design of the calciner. Scientific structure with large ratio of length to diameter is able to homogenize material to increase material retention time. Besides, LAFA's engineers has added rear extended pipe to provide more sufficient material burning space and also increase some the material retention time. There is fully combustion for pulverized coal to increase system efficiency. We also have LFRF pre-heater with precalciner and KHD new low-resistance six-stage preheater.

We are always committed to providing customers with the best service. From design to construction, we do our best to bring you the most efficient, energy-saving and environment-friendly cement production line.

ABOUT US

BUSINESS SEGMENT

PRODUCTS

Spare Parts

Project Case

CONTACT US

 18 Floor, 12 Jinlan Road,Jiangning 
      District,   Nanjing, Jiangsu, CN
   +86-17107814681
  +86-25-52101363
   lafa@lafaepc.com
https://www.bag-filters.com
 Copyright© 2022 Jiangsu LaFa International Engineering Group Co., Ltd.  Support by LeadongSitemap  苏ICP备2022049404号-1